|
Name: Phone: |
SAMPLE | ||||
| Basic 8 Hour Safety Course complete? | Drug Screen Required before badging for plant entry. | |||||
| Background Check Required? | Background Check Required. | |||||
| Date of Last Drug Testing? | Acetate Frame Safety Glasses only, No wire rims. | |||||
| Self Profile: | Scale of 1-7 | How Many Years Experienced As A MillWright? | ||||
| Your level of experience from 1 to 7. (7 being highest) | Have you ever worked in a Nuclear Plant? | |||||
| Skill Sets: | Desierd Daily Straight Time Hourly Pay? | |||||
| Read a Micrometer | (Actual Rate of pay depends on Experience & Client wages) | |||||
| Reverse Alignment Dial Indicator | Have you always stayed on the job until released by supervisor? | |||||
| Optical Alignment /Laser /Other | If No, Why? | |||||
| Set Pumps, Motors, Gear Boxes | ||||||
| Read Inside snap gages | ||||||
| Outside calipers | ||||||
| 4" Starret level | List Millwright Experience in Last Five (5) Years. | |||||
| Read a Blueprint | Name of Plants you have worked in, equipment worked on: | |||||
| Lift and move machinery | ||||||
| Vibration analysis | ||||||
| Equipment Experience Level: | ||||||
| Turbines Steam up to 100MW | ||||||
| Westinghouse Siemens Delaval ABB or other, list: | List Achievements, Education or other Training: | |||||
| General Electric/ Worthington | ||||||
| Positive Disp. Compressors | ||||||
| Dynamic Compressors | ||||||
| Installation Start-Ups | Welding Skills: | |||||
| Maintenance or Repairs | Certified Tested Expiration Date? | |||||
| Pumps/ Motors/gear boxes | Section 9 ASME, Stainless Steel, Inconel, small diameter Pipe. | |||||
| Requires 5 years expereince, 4 References, pass test, | ||||||
| Other: | prior to being on site prepared by client(s). | |||||
| Skilled in Control Systems | R' Stamp for boiler and tube? | |||||
| Plant Operations | Other Welding Skills / Details? | |||||
| Commets You would like to make for improvements to this form? | ||||||